Well, the move-out date on my self storage unit is fast approaching, which has had me motivated to finish the shop.
As of tonight, all (well, almost all) of the insulation is up and the workshop is (mostly) ready for drywall. I've had a few contractors out to the house to bid on hanging the drywall. So far, none of the bids have been low enough to convince me outsource this work. (Which is rather disappointing. Cheap labor is not hard to find in the Dallas area.)
Hacker Dad and Hacker Father-in-Law have volunteered to come over on Saturday to hang drywall, provided I have everything ready to go. While I really, really don't want to do this job myself, I can be an inveterate cheapskate and the relative merits of build-vs-buy are favoring a sore body this weekend.
Here are some pics of the current state of the workshop. As always, click for a full size version.